Pitting het woord, spiegelafwerking, mat oppervlak
Belangrijkste thechnologie
Frezen, slijpen, cnc, edm, draad snijden,
Oppervlaktebehandeling
Polijsten/spiegelpolijsten/hoge polijsten/textuur
Kwaliteitssysteem
Iso9001: 2008
Materiaal
Abs, pp, pc, pa66, tpu, pom, pmma, tpe, pc/abs
Mal staal
P20,2344, s136, 8407, nak80, h13
Loper
Hot runner/koude loper
Verpakking en levering
Verpakkingsdetails
Packaging Details
Products packaging:
1,With plastic bag,with pearl-cotton package.
2,To be packed in cartons.
3,Use glues tape to seal cartons.
4,Deliver out by DHL,FEDEX.
Or according to customers' requirement.
Injection molding packaging:
Standard wooden case,and pallet, suitable for shipment, to avoid damaging,or according to customer's requirement
Port
ShenZhen
Lead Time :
20 to 25 days for building production mould